Product Detail :
|
Development and Maintenance of (i) Beawar Masuda Goyala Section of SH-26A (Length 66.77 km), (ii) Arain Sarwar Section of SH-7E (Length 44.260 km), and (iii) Laxmipura Dora Dabi Ranaji Ka Gudha Section of SH-115 (Length 49.60 km); (Total length 160.630 km) through Public-Private Partnership (the “PPP”) under Design, Build, Operate/Maintain & Transfer (the “DBOT Hybrid Annuity”) Basis
|