Product Detail :
|
Development and maintenance of (i) beawar masuda goyala section of SH 26 A (Length 66.77 km), (ii) Arain sarwar section of SH – 7E (Length 44.260 km) & (iii) laxmipura dora dabi ranaji ka gudha section of SH - 115 (Length 49.60 km) (total length – 160.630 km) through public private partnership (the PPP) under design, build, operate / maintain & transfer (the DBOT hybrid annuity) basis.
|